8/3/2018 UPDATE: Rin Road BMP construction has been finished, the road is currently being excavated. New gravel, fabric and grid are being installed. Rough grading was to begin today. The 1st layer of asphalt (aka 'binder') will be down by next Tuesday or Wednesday. The final top coat of asphalt should be down by next Thursday or Friday (weather permitting). Residents have been personally notified in the area by the Road Inspector.